Walk to Natural Gas Facility

A long walk westward leads to the site of the backup natural gas facility, housed just south of Military Rd and graded down approximately 45 more feet. When removing trees...Read more


From Cell Phone Tower to Substation
From Cell Phone Tower to Substation
View from the cell phone tower, just off Military Rd (north of the tower) and panning down into the valley where the substation will be. Please note: based upon many factors still being incorporated into the design, the final location of each portion of the site may vary slightly from initial artist renderings and video tours. The recently selected Engineer, Procure, and Construct (EPC) vendor, Zachry Group, will have responsibility for the final site layout and design.
Walk to Natural Gas Facility
Walk to Natural Gas Facility
A long walk westward leads to the site of the backup natural gas facility, housed just south of Military Rd and graded down approximately 45 more feet. When removing trees, OPPD will abide by its avian protection plan, and offset any trees removed with new trees and planting habitat in the final design. Please note: based upon many factors still being incorporated into the design, the final location of each portion of the site may vary slightly from initial artist renderings and video tours. The recently selected Engineer, Procure, and Construct (EPC) vendor, Zachry Group, will have responsibility for the final site layout and design.
View from Substation
View from Substation
View from the site of the substation, panning from the tree line where the transmission lines will connect to the plant over to the east toward the tree lines that separate the site from the homes of Rambleridge. Please note: based upon many factors still being incorporated into the design, the final location of each portion of the site may vary slightly from initial artist renderings and video tours. The recently selected Engineer, Procure, and Construct (EPC) vendor, Zachry Group, will have responsibility for the final site layout and design.
Bird's Eye View of Property
Bird's Eye View of Property
A bird’s eye view, starting from the substation site, going straight up to capture the backup natural gas plant site, the intersection of 120th & Military and panning over to the edge of Rambleridge neighborhood and tree line by Military Road, continuing along the edge of property on Rambleridge Road. Please note: based upon many factors still being incorporated into the design, the final location of each portion of the site may vary slightly from initial artist renderings and video tours. The recently selected Engineer, Procure, and Construct (EPC) vendor, Zachry Group, will have responsibility for the final site layout and design.